Project Description: This project will renovate the existing high-bay industrial facility by constructing a new second floor within the structure. The approximately 20,000 GSF build-out will include testing laboratories, manufacturing space, and new office and administrative areas to support battery research for the Molinaroli College of Engineering.
Phase: Design
Anticipated Construction: September 2026 to June 2027