Skip to Content

Facilities Department

  • View of the inside of Sumwalt College entrance.

Sumwalt College

Project Description: Enhanced the front entry with expanded glass storefront to improve street visibility, maximize daylight within the lobby, and provide flexible space for a future café.

Phase: Completed

Completed: September 2025

Facilities Department


Challenge the conventional. Create the exceptional. No Limits.

©